Energy Savings Calculator
See what you would save by replacing a fixed-speed motor driven by a damper or throttling valve with a Volcano Electric IE5 permanent-magnet (PMSM) motor and drive. Adjust the inputs — results update instantly.
- IE5 Ultra-Premium efficiency class
- 0.4–110 kW EC fan motors & PMSM range
- IEC 60034-30-1 Standards-based calculation
Technical assumptions, methodology & sources
Baseline (your current system)
- Direct-on-line induction motor, 4-pole, 50 Hz.
- Nominal efficiencies per IEC 60034-30-1 Table 1 (IE1–IE4). China: GB 18613-2020 Grade 3 = IE3, Grade 2 = IE4, Grade 1 = IE5.
- Flow regulated by outlet damper (fan) or throttling valve (pump); part-flow power multipliers follow the published ABB FanSave / PumpSave control curves, originating from Westinghouse Bulletin B-851.
Upgrade (Volcano Electric)
- IE5 nominal efficiencies per IEC 60034-30-1 Ed. 2.0 (2025) / IEC TS 60034-30-2, cross-checked against GB 18613-2020 Grade 1.
- Speed control instead of throttling; shaft power follows the affinity laws (P ∝ n³) for systems with negligible static head.
- Drive efficiency from the US DOE part-load drive efficiency table (97% at full load, 95% at 50% load).
- ≤22 kW fan duty is served by the integrated HSE EC fan motor (motor + drive in one unit, IE5, IP54–IP66); above that by an HSI IE5 PMSM plus an HS-series FOC drive.
Financial & environmental factors
- Payback is simple (undiscounted): installed upgrade cost ÷ annual electricity cost saving. It excludes maintenance, power-factor and downtime benefits, and excludes any energy-efficiency subsidy.
- Default installed cost scales with motor size and is an industry-typical figure — always overwrite it with a real quotation.
- CO₂ factors: China 0.5306 kg/kWh (MEE & NBS, 2023 data, published 2025); EU-27 0.1834 (EEA, 2024); USA 0.3480 (EPA eGRID 2023); world 0.458 (Ember, 2025).
- Equivalences: 22 kg CO₂ absorbed per mature tree per year (European Commission, SWD(2021) 651); 2,300 kWh per electric car per year (ODYSSEE-MURE 10,800 km/yr at 21 kWh/100 km).
Disclaimer
This calculator gives a rough estimate for illustrative purposes only. It cannot capture every site variable — static head, duty-cycle distribution, ambient conditions, harmonics, cable length or existing plant condition. Figures are provided on an “as is” basis. Volcano Electric makes no representation, guarantee or warranty as to their accuracy or completeness and accepts no liability for decisions taken on the basis of them. Contact us for a site-specific assessment.